How to Lay Your Own Sod - DIY

Learn how to lay your own sod and save valuable time and money! It's a lot easier than you think, just spend 5 minutes reviewing these 7 steps of how to successfully lay your own sod.

 

STEP 1: Select the Right Type of Sod

Select the right type of grass for you and your site.

Give us a call or use the filter in our sod shop to help you select the right turfgrass for your site conditions and lifestyle.

STEP 2: Measure Area

Make a sketch of your lot and measure the area you wish to sod. Calculate the square feet of product needed by multiplying length times the width of the area measured. Deduct a reasonable amount for buildings, paved drives, and walkways.

length x width = square feet of sod needed

For assistance with odd lawn shapes, use our Lawn Area Calculator.

To avoid running short consider ordering slightly more sod than your measurements require.


STEP 3: Prepare Your Soil

Prepare the site by grading so that the soil slopes away from foundations and buildings, thus avoiding drainage problems. 

If renovating an existing lawn, destroy the current vegetation.

Using native soil only: Till to a depth of 4 to 6 inches, smooth the soil, remove rocks, roots, clods, and vegetation.

Using Soil³ humus compost: Soil³ should be mixed with the top layer of existing soil. Just raking the Soil³ into the existing top soil is usually sufficient. Smooth the soil, remove rocks, roots, clods, and vegetation. Our experience shows that no preplanting fertilizer is necessary when using Soil³. Apply and rake in dolomitic lime based on soil test results and/or according to the formulas below. More info at www.soil3.com and under Laying New Sod with Soil³.

Water heavily to see if water puddles in any low spots, and if it does, add soil and/or regrade to eliminate low spots. Keep soil surface 1/2 inch below walks and drives. Tilled soil will settle some.

Apply and rake in fertilizer and dolomitic lime based on soil test results and/or according to the formulas below.

Centipede per 1,000 sq. ft.: 10 lbs. Starter & Centipede Formulation 5-10-30 + Iron

All others per 1,000 sq. ft.: 15 lbs. Total Lawn Food 16-4-8 + Iron + 50 lbs. dolomitic lime

STEP 4: Schedule Delivery

Schedule your sod to be delivered after the site is prepared and you are ready to install. 

Prompt installation on the day of delivery is crucial to a strong beginning for your lawn. Find a spot in the shade to preserve your farm fresh sod as you lay it.

Read our hacks on how to Store Sod in the Shade - Even if You Don't Have a Tree.

New call-to-action


STEP 5: Install Sod

Water to dampen the bare soil and start laying sod immediately after delivery.

In hot weather, protect unlaid sod by placing in the shade.

New Sod Installation Details

  • Begin installing sod along the longest straight line, such as a driveway or sidewalk
  • Tightly butt and push edges against each other
  • Stretch lightly while placing the sod
  • Avoid gaps and overlaps

Cutting New Sod Edges

  • When you are cutting in and around edges, make clean cuts with a machete to prevent the sod from drying out
  • Lay the sod so that any gaps will be at the edge of your lawn
  • Fill in gaps along the edges with cleanly cut pieces of sod.

Stagger New Sod in a Brick-like Pattern

We recommend staggering end seams of new sod in a brick-like fashion for two reasons:

  • Aesthetics: A brick-like pattern looks best aesthetically as opposed to four corners meeting at one point.

  • Water Run Off: A brick-like pattern prevents long running seams in your sod. If there is a seam all the way down, the water will follow the seam and run all the way down and away from your lawn.

Laying Sod on Slopes

  • Lay the rolls of sod perpendicular to the slope to prevent your sod being washed away by heavy rainfall.

  • Do not lay sod horitonzally across a slope because it's more prone to being washed away at that angle.

  • Use sod staples (long U-shaped pins) to tack down the new sod and help it stay in place until it roots in the spring. Sod staples are especially helpful when laying sod on slopes.

downhill slope perpendicular

Rolling Your New Sod

Once your sod has been installed, roll your sod with a sod roller to help new sod roots come into better contact with the soil. This rolling process removes air pockets so your new sod roots faster and more thoroughly. It also helps level the lawn by smoothing out bumps and depressions.

  • Rent a sod-roller from your local hardware or equipment rental store.
  • Fill the sod roller with water. Don't over fill the sod roller - fill it only as much as you can handle pushing it.
  • Roll the sod roller across your lawn in a grid-like pattern.

How to Lay Sod Rolling Sod

Installing Dormant Sod

When installing dormant sod, consult our guide on How to Lay Dormant Sod.

STEP 6: Water Frequently

Water as You Lay Sod

Begin watering small sections within 30 minutes of installation. Keep in mind that each roll is a living plant that requires soil contact and moisture to survive.

Our saying is: Water as You Lay Your Sod. A good rule of thumb is to water after you've laid half a pallet and before moving on to the next pallet.

You know you've watered enough when the soil below the new sod is damp.

Watering Until it Roots

Water daily, or more often, keeping sod (and soil underneath) moist until it is firmly rooted. This will take only a few weeks and is faster in summer and when Soil³ humus compost is used to amend the soil.

To keep the soil moist, it may require watering more than once a day, but for a sort duration each time. The frequency and duration depends on your water pressure, climate, and time of year.

Example Scenarios:

  • On cool, overcast days in spring or fall, you may need to water new sod only once a day for 10-20 minutes to keep the soil under the sod moist;
  • On hot, sunny summer days, you may need to water sod three or more times a day, but for only 10-20 minutes each time (depending on your water pressure), to keep the soil under the sod moist.

Lift a piece of sod here and there to check that you are watering enough to wet the soil below the sod. Read our details about Watering New Sod.

Watering Your Established Lawn

After the rooting-in period, less frequent and deeper watering should begin.

Warm season lawns need at least 1 inch of water per week; a cool season Tall Fescue lawn needs 1 inch of water per week in the cooler months, but 2 inches of water per week during the summer.

Water to supplement rainfall shortages. If 1 or more inches of rainfall occur in a week, additional irrigation is not necessary. Example: if 1/2 inch of rain occurs in a week, apply 1/2 inch by irrigation.

Do not waste water by over watering; avoid run-off. (How and When to Water)

Weather conditions will dictate the amount and frequency of watering. Be certain that your new lawn has enough moisture to survive hot, dry, or windy periods. We have focused instructions about How to Care for Your Lawn When it's Hot.

Water areas on mounds and berms and near buildings more often, where reflected heat dries the turf.

STEP 7: Mow

Begin mowing as soon as there is something to mow. It is important that mowing not be delayed too long.

Cut high the first time, but gradually and deliberately lower the cut-height. Find the ideal cutting height for your turf type in these maintenance guides.

Lay Sod Yourself or Hire Help

By following the steps above, you can install your sod and have the satisfaction of seeing the work of your hands.

However, there are times when we all need to hire help. When that's the case, we will help you find a local landscaper. All you need to do is fill out our Pro Connect form and we'll get vetted landscapers in touch with you.